How to Calculate LCC Life Cycle Cost for 3P

The 3P approach encour­ages us to make design deci­sions that deliv­er the best com­bi­na­tion of qual­i­ty, pro­duc­tiv­i­ty, flex­i­bil­i­ty, and speed. The 3P activ­i­ties con­sid­er both the ini­tial invest­ment cost and run­ning cost, with the aim of deliv­er­ing the best LCC or life cycle cost. Learn how to cal­cu­late LCC and when to use NPV to account for the dis­count­ed val­ue of future cash in this calculation.

Course Videos

1

What Is 3P Production Preparation Process?

08:41

2

Getting Started with 3P

05:17Members only

3

The 3P Project Charter

03:30Members only

4

The 3P Workshop

06:20Members only

5

3P Step 1: Define the Function

05:11Members only

6

3P Step 2: Sketch 7 Ways

06:58Members only

7

3P Step 3: Mock Up the Process Design Alternatives

05:33Members only

8

3P Step 4: Select the Top 3 Process Alternatives

03:11Members only

9

3P Step 5: Simulate the Top 3 Alternatives

07:13Members only

10

3P Step 6: Select Top 1 Design Option

06:21Members only

11

3P Step 7: Prepare Equipment Acquisition Plan

04:09Members only

12

What Is Moonshine in 3P?

05:51Members only

13

The 7 Flows of 3P

08:00Members only

14

The 16 Catchphrases of 3P

03:34Members only

15

3P Catchphrase 1: Production Preparation Should Be Lightning Fast

02:05Members only

16

3P Catchphrase 2: Build Equipment and Layout for Smooth Material Flow

04:44Members only

17

3P Catchphrase 3: Use Additive Equipment

04:13Members only

18

3P Catchphrase 4: Build Equipment That Allows Easy Changeovers

02:09Members only

19

3P Catchphrase 5: Make Equipment Easy to Relocate

02:24Members only

20

3P Catchphrase 6: Use Versatile Equipment That's Easy To Reconfigure

02:38Members only

21

3P Catchphrase 7: Make Operator Workstation Narrow

03:53Members only

22

3P Catchphrase 8: Design Equipment And Layout For Ease Of Operator Movement

07:07Members only

23

3P Catchphrase 9: Eliminate Wasted Machine Cycle Time

02:22Members only

24

M3P Catchphrase 10: Build Equipment For Small, Swift Flow Lines

01:28Members only

25

3P Catchphrase 11: Build Narrow, Vertical Flow Lines

02:54Members only

26

3P Catchphrase 12: Build Equipment For One-Piece Pull

04:03Members only

27

3P Catchphrase 13: Build Quick Changeover Capability Into Equipment

06:54Members only

28

3P Catchphrase 14: Link Machines for Smooth Loading and Unloading

02:10Members only

29

3P Catchphrase 15: Use Multiple Lines and Rectified Flows

02:32Members only

30

3P Catchphrase 16 Spiral Upwards To Jidoka

03:19Members only

Current Video

How to Calculate LCC Life Cycle Cost for 3P

06:40Members only

32

Next VideoBiomimicry Looking for Design Ideas in Nature

03:49Members only

33

3P for Product Development

04:03Members only